In progressBogotá Metro Line 1 Stations 5, 7, and 8
Construction contract for building Stations 5, 7, and 8 of Bogotá Metro Line 1.
Bogotá D.C.
Civil engineering, construction, and infrastructure in Colombia

Projects
Explore XIE's projects by business unit, location, and status: completed and in progress.
36 projects
In progressConstruction contract for building Stations 5, 7, and 8 of Bogotá Metro Line 1.
Bogotá D.C.
In progressWater and Sanitation
Rehabilitation of the dual carriageway, water supply and sewer networks, and urban public spaces of Avenida Internacional, between Calle 3 and Calle 12, in Leticia.
Leticia, Amazonas
CompletedBuildings
A large-scale project comprising 39 buildings, built to high standards of security, functionality, and durability for the correctional system.
Florencia, Caquetá
CompletedBuildings
Construction of a submarine hangar with a dry berth position at the Cotecmar facilities in Mamonal, Cartagena.
Cartagena, Bolívar
CompletedRoad Infrastructure
Execution of the construction works and utility network works included in the concession contract to adapt Avenida Suba Section II to the TransMilenio system.
Bogotá D.C.
CompletedRoad Infrastructure
Construction of sections 2 and 3 of the SITM trunk line along the Bucaramanga–Floridablanca highway, between the Provenza bridge and the Cañaveral vehicular bridge.
Bucaramanga and Floridablanca, Santander
In progressBuildings
Works for the San José de Cúcuta Passenger and Freight Transportation Terminal: site preparation and water supply, sewer, and WWTP systems.
Cúcuta, Norte de Santander
CompletedRoad Infrastructure
Construction works, on a unit-price, not-to-exceed basis, for the local road network and associated public space in the Kennedy locality, Group 1.
Bogotá D.C.
CompletedBuildings
Construction of the main hospital of Bahía Solano, Hospital Julio Figueroa Villa, for the Colombian Navy Revolving Fund.
Bahía Solano, Chocó
CompletedBuildings
Contracts with Aerocivil for seismic retrofit works at the Quibdó, Neiva, Tumaco, and Bucaramanga airports.
Quibdó, Neiva, Tumaco, and Bucaramanga
CompletedBuildings
Construction of the BAEEV Battalion in Puerto Jordán, Arauca, for the Ministry of National Defense – Military Forces Logistics Agency.
Arauquita, Arauca
CompletedBuildings
Construction of the facilities of the Unified Action Group for Personal Liberty (Gaula) and the Police Intelligence Section (Sipol) in the department of Arauca.
Arauca
CompletedRoad Infrastructure
Construction of the widening of the Carrera 65 dual carriageway between Calle 101 and Calle 103E, and ancillary works, in Medellín.
Medellín, Antioquia
CompletedRoad Infrastructure
Construction of the Calle 52 tunnel between Avenida Paralela and the Colegio Los Ángeles area, in Manizales.
Manizales, Caldas
CompletedRoad Infrastructure
Construction and paving of the alternate road to the port of Santa Marta, Mamatoco – marine terminal sector, with ancillary works.
Santa Marta, Magdalena
CompletedRoad Infrastructure
Studies, design, and construction of roads in the Jambaló–Toribío sector, in Cauca, with a 23.5 km paved section.
Jambaló and Toribío, Cauca
CompletedRoad Infrastructure
Maintenance of the Presidente Cúcuta–Pamplona highway, Route 55, Section 5505.
Cúcuta and Pamplona, Norte de Santander
CompletedRoad Infrastructure
Critical-site response and preventive maintenance of secondary and tertiary roads with machinery packages in Norte de Santander.
Norte de Santander
CompletedPublic Space and Urban Development
Implementation and construction of stations, pedestrian bridges, bicycle bridges, and public space along the Américas trunk line and Avenida Ciudad de Cali for the TransMilenio system.
Bogotá D.C.
CompletedPublic Space and Urban Development
Studies, design, and construction of the Monument to the Fallen plaza in Bogotá D.C.
Bogotá D.C.
CompletedPublic Space and Urban Development
Construction of the urban development works for the Metrocable Nuevo Occidente project, between the Metro's San Javier station and the Pajarito area in Medellín.
Medellín, Antioquia
CompletedOil and Gas
Construction of platforms for the Gonzales 1 and Cagu 1 exploratory wells in El Zulia (Norte de Santander) and Rionegro (Santander) for Ecopetrol S.A.
El Zulia and Rionegro
CompletedAirport Infrastructure
Development of 100 meters of runway, a taxiway, an apron, and ancillary works for the Grupo Aeronaval del Pacífico.
CompletedIllustrative imageBuildings
Construction of the facilities and access road for the industrial complex of Ecopetrol's Apiay Operations Superintendency.
Meta
CompletedIllustrative imageBuildings
Physical and electrical upgrades for the third phase of the Fraternidad campus of the Instituto Tecnológico Metropolitano in Medellín.
Medellín, Antioquia
CompletedIllustrative imageRoad Infrastructure
Works required for road rehabilitation in the localities of Usme, San Cristóbal, and Rafael Uribe in Santafé de Bogotá (Group No. 6).
Bogotá D.C.
CompletedIllustrative imageRoad Infrastructure
Works required for road rehabilitation in the localities of Bosa, Fontibón, and Kennedy in Santafé de Bogotá D.C. (Group 3).
Bogotá D.C.
CompletedIllustrative imageRoad Infrastructure
Works required for road rehabilitation in the localities of Usaquén and Chapinero in Santafé de Bogotá (Group No. 1).
Bogotá D.C.
CompletedIllustrative imageRoad Infrastructure
Works required for road construction in the locality of Ciudad Bolívar in Bogotá D.C.
Bogotá D.C.
CompletedIllustrative imageRoad Infrastructure
Evaluation and rehabilitation of roads in the locality of Tunjuelito, Bogotá.
Bogotá D.C.
CompletedIllustrative imageRoad Infrastructure
Study, design, and construction of roads in the locality of Suba, Bogotá D.C.
Bogotá D.C.
CompletedIllustrative imageRoad Infrastructure
Adjustment or modification of the designs and construction of the road network and ancillary works in the locality of San Cristóbal, Group 2, Bogotá D.C.
Bogotá D.C.
CompletedIllustrative imageRoad Infrastructure
Improvement and paving works on the Villagarzón–Mocoa sector of the Puente Internacional San Miguel–Mocoa highway, Route 45, Section 4502.
Villagarzón and Mocoa, Putumayo
CompletedIllustrative imageOil and Gas
Access road upgrading and construction of well pads for oil well drilling in the fields of Ecopetrol S.A.'s Mares Operations Superintendency.
Santander
CompletedIllustrative imageWater and Sanitation
Execution of phase VI of the Sewer Master Plan of the municipality of San Bernardo, with sanitation infrastructure for wastewater collection and conveyance.
CompletedIllustrative imageWater and Sanitation
Construction of the water supply system, sewer system, and wastewater treatment plant (WWTP) for the Florencia Medium-Security Correctional Facility.
Florencia, Caquetá
Let's talk
Tell us what you need to build. The XIE team will review your request and get back to you.