Road Infrastructure

Road Rehabilitation in Bosa, Fontibón, and Kennedy

CompletedBogotá D.C.

Images labeled “Illustrative image” are reference depictions, not photographs of the project.

Works required for road rehabilitation in the localities of Bosa, Fontibón, and Kennedy in Santafé de Bogotá D.C. (Group 3).

Project data sheet

Status
Completed
Business unit
Road Infrastructure
Location
Bogotá D.C.
Client / agency
Instituto de Desarrollo Urbano – IDU
Contract
IDU 516 2000
Year
2000

Description

Contract IDU 516 2000: works required for the rehabilitation of roads in the following localities of Santafé de Bogotá D.C.: Bosa, Fontibón, and Kennedy. Group 3.

Key facts

Localities
Bosa, Fontibón, and Kennedy
Group
3

Related projects

More projects from the same business unit or region.

  • Kennedy Local Road Network and Public Space, a project by XIE S.A.Completed

    Road Infrastructure

    Kennedy Local Road Network and Public Space

    Construction works, on a unit-price, not-to-exceed basis, for the local road network and associated public space in the Kennedy locality, Group 1.

    Bogotá D.C.

  • Avenida Suba Section II for TransMilenio, a project by XIE S.A.Completed

    Road Infrastructure

    Avenida Suba Section II for TransMilenio

    Execution of the construction works and utility network works included in the concession contract to adapt Avenida Suba Section II to the TransMilenio system.

    Bogotá D.C.

Contact

Have a similar project?

Tell us what you need, and the XIE team will get back to you.