CompletedRoad Infrastructure
Kennedy Local Road Network and Public Space
Construction works, on a unit-price, not-to-exceed basis, for the local road network and associated public space in the Kennedy locality, Group 1.
Bogotá D.C.
Civil engineering, construction, and infrastructure in Colombia
Road Infrastructure
Images labeled “Illustrative image” are reference depictions, not photographs of the project.
Construction of sections 2 and 3 of the SITM trunk line along the Bucaramanga–Floridablanca highway, between the Provenza bridge and the Cañaveral vehicular bridge.
Construction of sections 2 and 3 of the SITM (integrated mass transit system) trunk line along the Bucaramanga–Floridablanca highway, between the Provenza bridge and the Cañaveral vehicular bridge.
More projects from the same business unit or region.
CompletedRoad Infrastructure
Construction works, on a unit-price, not-to-exceed basis, for the local road network and associated public space in the Kennedy locality, Group 1.
Bogotá D.C.
In progressWater and Sanitation
Rehabilitation of the dual carriageway, water supply and sewer networks, and urban public spaces of Avenida Internacional, between Calle 3 and Calle 12, in Leticia.
Leticia, Amazonas
CompletedRoad Infrastructure
Execution of the construction works and utility network works included in the concession contract to adapt Avenida Suba Section II to the TransMilenio system.
Bogotá D.C.
Contact
Tell us what you need, and the XIE team will get back to you.