Bogotá Metro Line 1 Stations 5, 7, and 8

In progressBogotá D.C.

Images labeled “Illustrative image” are reference depictions, not photographs of the project.

Construction contract for building Stations 5, 7, and 8 of Bogotá Metro Line 1.

Project data sheet

Status
In progress
Location
Bogotá D.C.
Contract
METRO1-SC-E-241009
Contract value
COP 104,226,843,845.00

Description

Construction contract METRO1-SC-E-241009 for building Stations 5, 7, and 8 of Bogotá Metro Line 1, along Avenida Primero de Mayo.

Key facts

Project
Bogotá Metro Line 1
Scope
Construction of Stations 5, 7, and 8
Station 5
Av. Primero de Mayo / Cll 40 Sur – Cll 39 Sur
Station 7
Av. Primero de Mayo / Av. 68 – Carrera 52C
Station 8
Av. Primero de Mayo / Carrera 50 roundabout

Related projects

More projects from the same business unit or region.

  • Kennedy Local Road Network and Public Space, a project by XIE S.A.Completed

    Road Infrastructure

    Kennedy Local Road Network and Public Space

    Construction works, on a unit-price, not-to-exceed basis, for the local road network and associated public space in the Kennedy locality, Group 1.

    Bogotá D.C.

  • Avenida Suba Section II for TransMilenio, a project by XIE S.A.Completed

    Road Infrastructure

    Avenida Suba Section II for TransMilenio

    Execution of the construction works and utility network works included in the concession contract to adapt Avenida Suba Section II to the TransMilenio system.

    Bogotá D.C.

  • TransMilenio Avenida Américas, a project by XIE S.A.Completed

    Public Space and Urban Development

    TransMilenio Avenida Américas

    Implementation and construction of stations, pedestrian bridges, bicycle bridges, and public space along the Américas trunk line and Avenida Ciudad de Cali for the TransMilenio system.

    Bogotá D.C.

Contact

Have a similar project?

Tell us what you need, and the XIE team will get back to you.