Oil and Gas

Oil Well Pads in Mares

CompletedSantander

Images labeled “Illustrative image” are reference depictions, not photographs of the project.

Access road upgrading and construction of well pads for oil well drilling in the fields of Ecopetrol S.A.'s Mares Operations Superintendency.

Project data sheet

Status
Completed
Location
Santander
Client / agency
Ecopetrol S.A.
Contract
4009496

Description

Access road upgrading and construction of well pads for oil well drilling, carried out for the fields of the Mares Operations Superintendency of Ecopetrol S.A.'s Magdalena Medio Regional Management.

Key facts

Fields
Mares Operations Superintendency, Magdalena Medio Regional Management
Scope
Access road upgrading and well pad construction

Related projects

More projects from the same business unit or region.

  • Kennedy Local Road Network and Public Space, a project by XIE S.A.Completed

    Road Infrastructure

    Kennedy Local Road Network and Public Space

    Construction works, on a unit-price, not-to-exceed basis, for the local road network and associated public space in the Kennedy locality, Group 1.

    Bogotá D.C.

  • Avenida Internacional in Leticia, a project by XIE S.A.In progress

    Water and Sanitation

    Avenida Internacional in Leticia

    Rehabilitation of the dual carriageway, water supply and sewer networks, and urban public spaces of Avenida Internacional, between Calle 3 and Calle 12, in Leticia.

    Leticia, Amazonas

  • Avenida Suba Section II for TransMilenio, a project by XIE S.A.Completed

    Road Infrastructure

    Avenida Suba Section II for TransMilenio

    Execution of the construction works and utility network works included in the concession contract to adapt Avenida Suba Section II to the TransMilenio system.

    Bogotá D.C.

Contact

Have a similar project?

Tell us what you need, and the XIE team will get back to you.